Six levels of evidence-driven coverage, from as-built to renewal.
Level 1 — As-Built
Scan-based as-built capture in 2D drawings and 3D models. Reflects what is actually built on site, with no judgement or assessment applied.
Talk to usLevel 2 — Quantity Management & Verification
As-built quantities measured from actual site conditions, updated at regular intervals and linked to cost reporting.
Talk to usLevel 3 — Cost & Schedule Assessment
Assess the critical path of the construction program against the original plan, with total project cash-flow prediction.
Talk to usLevel 4 — Compliance Check & Monitoring
Identify non-compliance and errors from source material and suppliers through to the final build, across design and construction phases.
Talk to usLevel 5 — Defects & Solutions During Construction
Identify defects during construction and provide practical, actionable remediation immediately, before issues compound.
Talk to usLevel 6 — Post-Construction Defects, Maintenance & Renewal
Support post-construction defect management, long-term maintenance, and future renovation across the asset lifecycle.
Talk to us
One project. Two delivery models.
~$800K difference.
On a typical 10,000 GFA project running 20 months, SGF's AI-delivery model costs roughly 70% less than the traditional consultancy stack — and the gap widens with every project we ingest.
SCENARIO · 10,000 GFA · 20-month build · NSW Class 2
A$799,000
Saved per project · vs traditional delivery
TraditionalA$1,144,000
SGF AIA$345,000
Reduction≈ 70%
Cost model · SGF AI
Smart Green Futuristic
Total1 platform · 1 dataset · 1 source of truth
A$345K
Marginal cost drops with each project ingested — the data flywheel.
Cost model · Traditional
Consultancy-led
TotalMultiple consultants · siloed data · manual integration
A$1.14M
Costs rise with project volume — driven by consultant fees and labour intensity.
Why this gets better over time. Each project we ingest improves the model's accuracy and reduces its marginal cost. Traditional consultancy fees do the opposite — they scale with headcount.
Source · SGF cost model · 10,000 GFA × 20-month NSW Class 2 project
From scan to as-built to compliance — on a real Sydney project.
As-Built Capture
Point cloud scan of the Epping basement — captured from real site conditions, accurate to centimetre level.
Scan-to-BIM
Aligned BIM model produced from the scan, ready for variance analysis against the design intent.
Variance Analysis
Floor-plan-level comparison highlights as-built differences against the architectural set.
Compliance & Reporting
NCC / AS-aligned compliance check ready for submission to the government portal.